www.implement-lean-manufacturing.com
Home About Lean Lean Road Map Lean Foundations Core Concepts Advanced Concepts Lean Store Site Map
NAVIGATION LEGEND
Silver - ELSEinc.com
Orange -main areas
Aqua - info pages.
Lean Store
ILM Lean Blog
Lean Road Map
About Lean
Starting the Lean Trans.
Choosing Lean Pres.
Lean Overview Pres.
Lean Manu. Assessment
Lean Ball Game
Lean Foundations
5S Presentation
5S Game
5S Audit Check-sheet
7 Wastes Presentation
7 Wastes Check-sheet
1 Piece Flow
Batch to Flow
5 Why
Cell Layout and Flow
Ergonomics
Standardized Work
Lean Core Concepts
Value Stream Mapping
VSM Presentation
Kaizen
Kaizen Presentation
Poka Yoke
Poka Yoke Simulation
TPM at a Glance
TPM Implementation
TPM Presentation
TPM Training
Autonomous Maintenance
Continuous Improvement
Lean Advanced Concepts
Kanban Presentation
SMED Simulation
Process Capability Pres
SPC Presentation
Lean Links
Search
 
News and Updates
Interested in being kept up to date with information from Implement Lean Manufacturing website or on ELSE Inc. new or revised products send us an email here.
 
Microsoft Store

Microsoft Store

 

training

Definition of TPM

Total Productive Maintenance represents a set of techniques to ensure that every machine in a production process is always able to perform its required tasks (maximum machine availability.

A TPM PowerPoint Presentation is available if you require more information.

Goals

  • Zero accidents
  • Zero breakdowns
  • Zero defects
  • Zero loss of equipment speed

Benefits

  • Improves safety
  • Improves environment (zero leaks, spills)Improves quality
  • Employee involvement morale
  • Improves skill level of all employees
  • Building block for Lean Manufacturing
  • Cost reduction

Characteristics

  •  It requires the participation of all employees (maintenance personnel, line managers, manufacturing engineers, quality personnel, and operators)Operators perform daily activities such as inspecting equipment, cleaning, lubricating, etc.
  • It focuses on the major 6 losses
    1. Equipment breakdowns - downtime
    2. Setup and minor adjustments (changeover)
    3. Idling and minor stoppages
    4. Reduced speed
    5. Scrap and rework
    6. It addresses the total life cycle of equipment to revise the maintenance practices, activities, and improvements in relation to where the equipment is in its life cycle

Major Components

  1. Autonomous Maintenance
    • It involves operators performing routine tasks focused on preventing early equipment deterioration, controlling contamination
  2. Predictive Maintenance Techniques
    • Oil analysis
    • Vibration analysis
    • Infrared analysis
    • Thermography
  3. Preventive Maintenance Techniques
    • Lubrication
    • Visual Inspection
    • Filter change
    • Oil change
    • Wear parts replacement
    • etc.




Next: Go from "TPM" to "Total Productive Maintenance Implementation" Page



Return to Home Page

 


 

Welcome to the Implement Lean Manufacturing website, a division of ELSE Inc. We have added a page on Statistical Process Control.

The ELSE Inc. website is the direct result of our efforts to grow to better serve you our customer and friend.

Improving the value we provide to you is our greatest focus, thank you for your support.




Customized and Customizable Presentation

If you would like to have a presentation or simulation that is customized for your organization or Customizable PowerPoint Presentation please contact sales@elseinc.com.




Thank You to Our Customers

customers

customers

customers

customers

customers

Important Links

The Lean Store

Tony McNaughton's  Lean Thinking Pty Ltd.

 

     
 
Home | Lean Store | Lean Road Map | Lean Foundations | Lean Core Concepts | Lean Advanced Concepts | VSM Presentation | TPM Presentation | SMED Game | 7 Wastes Simulation | 7 Wastes Checksheet | Poka Yoke Game | 1 Piece Flow Game | Kanban Presentation
ELSE Inc. Site | Starting the Lean Transformation | Cell Layout and Flow Concepts Presentation | Ergonomics Presentation | From Batch to Flow Game | ILM Lean Blog | Introduction to Process Capability | Standardized Work Presentation
Choosing Lean | Kaizen Presentation | 5 Why Presentation | 5S Game | 5S Presentation | 5S Audit Sheet | Lean Overview Presentation | SPC Presentation | 5S | 5S Audit | 5S Housekeeping | 5S Principles | 5S Program | 5S Training | Andon | Autonomation | Autonomous Maintenance
Continuous Improvement | Heijunka | Jidoka | JIT | Kaizen | Kanban | Lean Behaviors | Lean Implementation | Lean Links | Lean Assessment | Lean Blog | Lean Definitions | Lean Principles | Lean Thinking | Lean Training | Lean Tools | Lean Store | What is Lean Manu.
Poka Yoke | Seven Wastes | Site Search | SMED | TPM | Value Stream Mapping | TPM Training | TPM Implementation | TPS | TPS Training | Implementation Rules | Visual Factory | Contact | Lean Overview | SPC Presentation | Lean Manufacturing Assessment
5S Presentation | 5S Game | 5S Audit Sheet | 7 Wastes Presentation | 7 Wastes Check-sheet | 5 Whys Presentation | VSM Presentation | TPM Presentation | SMED Game | Poka Yoke Game | Kanban Presentation | Kaizen Presentation | 1 Piece Flow Game | Choosing Lean Presentation
Copyright 2008-2010 © ELSE Inc. Implement-Lean-Manufacturing.com All rights reserved