www.implement-lean-manufacturing.com
Home About Lean Lean Road Map Lean Foundations Core Concepts Advanced Concepts Lean Store Site Map
NAVIGATION LEGEND
Silver - ELSEinc.com
Orange -main areas
Aqua - info pages.
Lean Store
ILM Lean Blog
Lean Road Map
About Lean
Starting the Lean Trans.
Choosing Lean Pres.
Lean Overview Pres.
Lean Manu. Assessment
Lean Ball Game
Lean Foundations
5S Presentation
5S Game
5S Audit Check-sheet
7 Wastes Presentation
7 Wastes Check-sheet
1 Piece Flow
Batch to Flow
5 Why
Cell Layout and Flow
Ergonomics
Standardized Work
Lean Core Concepts
Value Stream Mapping
VSM Presentation
Kaizen
Kaizen Presentation
Poka Yoke
Poka Yoke Simulation
TPM at a Glance
TPM Implementation
TPM Presentation
TPM Training
Autonomous Maintenance
Continuous Improvement
Lean Advanced Concepts
Kanban Presentation
SMED Simulation
Process Capability Pres
SPC Presentation
Lean Links
Search
 
News and Updates
Interested in being kept up to date with information from Implement Lean Manufacturing website or on ELSE Inc. new or revised products send us an email here.
 
Microsoft Store

Microsoft Store

 

Poka Yoke Definition

  • Techniques that help operators avoid mistakes in their work caused by choosing the wrong part, leaving out a part, installing a part backwards, etc.
  • It involves the implementation of fail-safe ways methods that detect or prevent human and machine error at or near the source
  • It provides instant feedback and prevention of quality problems

Definition of a Defect

  • The result of any deviations from product specifications that lead to customer dissatisfaction

Definition of an Error

  • Any deviation from a specified manufacturing process
  • The result of an error is shown in a defect.

Prevention Device

  • Is a device or process that prevents errors from occurring or prevents these errors from creating defects
  • Examples: part locators, part present sensors

Detection Device

  • Is a device that will detect a defect or concern and initiate a corrective action
  • Examples: vision system, limit sensorstraining

Causes of Errors

  • Processing omissions
  • Processing errors
  • Error in setting up the work piece
  • Missing parts
  • Improper item
  • Processing wrong work piece
  • Operations errors
  • Adjustment, measurement, dimension errors
  • Errors in equipment maintenance/repair
  • Errors in preparation of tools/jigs
  • Areas with high error potential Adjustments
  • Areas with high error potential Tooling and tooling changes
  • Areas with high error potential Dimensions/specifications
  • Areas with high error potential Many mixed parts
  • Areas with high error potential Multiple steps
  • Areas with high error potential Infrequent production
  • Areas with high error potential Lack of an effective standard
  • Areas with high error potential Symmetry
  • Areas with high error potential Asymmetry
  • Areas with high error potential Rapid repetition
  • Areas with high error potential High volume
  • Areas with high error potential Environmental conditions

Implementation

  • Develop team
  • Create Error Proofing Implementation Sheet
  • Identify and describe defect
  • Determine location the defect was found & made
  • Identify root cause
  • Current process and deviations from standards
  • Propose and implement improved process
  • Measure
  • Standardize

Guidelines for error proof devices

  • Low cost, easy to implement
  • Prevent the ability to make a defect / prevent the defect from being passed on
  • Provide immediate feedback




Return from "Poka Yoke" to Home Page


 

Welcome to the Implement Lean Manufacturing website, a division of ELSE Inc. We have added a page on Statistical Process Control.

The ELSE Inc. website is the direct result of our efforts to grow to better serve you our customer and friend.

Improving the value we provide to you is our greatest focus, thank you for your support.




Customized and Customizable Presentation

If you would like to have a presentation or simulation that is customized for your organization or Customizable PowerPoint Presentation please contact sales@elseinc.com.




Thank You to Our Customers

customers

customers

customers

customers

customers

Important Links

The Lean Store

Tony McNaughton's  Lean Thinking Pty Ltd.

 

     
 
Home | Lean Store | Lean Road Map | Lean Foundations | Lean Core Concepts | Lean Advanced Concepts | VSM Presentation | TPM Presentation | SMED Game | 7 Wastes Simulation | 7 Wastes Checksheet | Poka Yoke Game | 1 Piece Flow Game | Kanban Presentation
ELSE Inc. Site | Starting the Lean Transformation | Cell Layout and Flow Concepts Presentation | Ergonomics Presentation | From Batch to Flow Game | ILM Lean Blog | Introduction to Process Capability | Standardized Work Presentation
Choosing Lean | Kaizen Presentation | 5 Why Presentation | 5S Game | 5S Presentation | 5S Audit Sheet | Lean Overview Presentation | SPC Presentation | 5S | 5S Audit | 5S Housekeeping | 5S Principles | 5S Program | 5S Training | Andon | Autonomation | Autonomous Maintenance
Continuous Improvement | Heijunka | Jidoka | JIT | Kaizen | Kanban | Lean Behaviors | Lean Implementation | Lean Links | Lean Assessment | Lean Blog | Lean Definitions | Lean Principles | Lean Thinking | Lean Training | Lean Tools | Lean Store | What is Lean Manu.
Poka Yoke | Seven Wastes | Site Search | SMED | TPM | Value Stream Mapping | TPM Training | TPM Implementation | TPS | TPS Training | Implementation Rules | Visual Factory | Contact | Lean Overview | SPC Presentation | Lean Manufacturing Assessment
5S Presentation | 5S Game | 5S Audit Sheet | 7 Wastes Presentation | 7 Wastes Check-sheet | 5 Whys Presentation | VSM Presentation | TPM Presentation | SMED Game | Poka Yoke Game | Kanban Presentation | Kaizen Presentation | 1 Piece Flow Game | Choosing Lean Presentation
Copyright 2008-2010 © ELSE Inc. Implement-Lean-Manufacturing.com All rights reserved