www.implement-lean-manufacturing.com
Home About Lean Lean Road Map Lean Foundations Core Concepts Advanced Concepts Lean Store Site Map
NAVIGATION LEGEND
Silver - ELSEinc.com
Orange -main areas
Aqua - info pages.
ILM Lean Blog
Lean Store
Lean Road Map
About Lean
Starting the Lean Trans.
Choosing Lean Pres.
Lean Overview Pres.
Lean Manu. Assessment
Lean Ball Game
Lean Foundations
5S Presentation
5S Game
5S Audit Check-sheet
7 Wastes Presentation
7 Wastes Check-sheet
1 Piece Flow
Batch to Flow
5 Why
Cell Layout and Flow
Ergonomics
Standardized Work
Lean Core Concepts
Kaizen Presentation
Poka Yoke Simulation
TPM Presentation
Lean Advanced Concepts
Value Stream Mapping
VSM Presentation
Kanban
Kanban Presentation
SMED/Quick Changeover
SMED Simulation
Heijunka
Statistical Process Cont.
Process Capability Pres
SPC Presentation
Just In Time
Lean Links
Search

News and Updates
Interested in being kept up to date with information from Implement Lean Manufacturing website or on ELSE Inc. new or revised products send us an email here.
 
Microsoft Store

Microsoft Store

JIT is one of the three pillars of Toyota Manufacturing System.

It is, in fact, an inventory strategy aimed at reducing the inventory of work-in process (WIP) therefore increasing the profit.

The process uses Kanban signals that "tell" the process when to make the next part or lot of parts.

Just-In-Time also promotes production leveling by using the Heijunka box to do so.

SMED is another element of JIT created with the purpose of minimizing the waiting time due to setup delay.

As you can find information about the other elements on their respective pages, let's focus our attention on the Material Logistics component of JIT.

  1. Plan and Implement Logistics
  2. Schedule Component Production
  3. Manage External Logistics
  4. Manage Internal Logistics

a. Plan and Implement Logisticstraining

The planning process begins at the workstation and works through the supply chain to the supplier

It looks at:

  1. Packaging- Light weights and no more than 2 hours of parts in a pack
  2. Workstation design
    • Minimize walk time,
    • Presents the part for easy access
    • Stores all parts needed at the workstation
  3. In-plant replenishment
    • Market areas optimally located to reduce the time required to replenish the line side
    • Plans that pull material to the line side in a timely manner while minimizing waste
    • Established material handling routes that will be marked
    • Optimize material replenishment in the plant
  4. Supply chain
    • Optimize material movement from supplier to the plant

b. Schedule Component Production

  • Production is properly coordinated to support customer requirements- Inventory is maintained at minimum levels
  • Material ordered to support production
  • Plan Production – 6 months in advance Impact of calendar, PM’s, shift patterns, resource constraints
  • Schedule Production - 1 month in advance Automatically generates workstation schedules to support customer demand
  • Execute Production – Day to Day Pull process that schedules upstream process based on demand of downstream processes

c. Manage External Logistics

Develop an optimal logistics network that will result in the shipment of materials more frequently in smaller quantities and deliver materials at specified times

Key elements:

  • Lead Logistics Provider to manage all inbound transportation of materials
  • Real-time information system to electronically communicate the fixed, leveled schedule and forecast
  • Material picked up and delivered at scheduled windows
  • Shipments are validated at the supplier’s dock
  • Live unloading/loading
  • Returnable containers require the same shipping documents as production parts

d. Manage Internal Logistics

A disciplined in-plant material handling process used to pull material to the point of use

Use of Visual Management techniques (every part has a place and that place is labeled)




Return from "JIT" to Home Page


Welcome to the Implement Lean Manufacturing website, a division of ELSE Inc. We have added a page on Statistical Process Control.

The ELSE Inc. website is the direct result of our efforts to grow to better serve you our customer and friend.

Improving the value we provide to you is our greatest focus, thank you for your support.




Customized and Customizable Presentation

If you would like to have a presentation or simulation that is customized for your organization or Customizable PowerPoint Presentation please contact sales@elseinc.com.




Thank You to Our Customers

customers

customers

customers

customers

customers

Important Links

The Lean Store

Tony McNaughton's  Lean Thinking Pty Ltd.

 

     
 
Home | Lean Store | Lean Road Map | Lean Foundations | Lean Core Concepts | Lean Advanced Concepts | VSM Presentation | TPM Presentation | SMED Game | 7 Wastes Simulation | 7 Wastes Checksheet | Poka Yoke Game | 1 Piece Flow Game | Kanban Presentation
ELSE Inc. Site | Starting the Lean Transformation | Cell Layout and Flow Concepts Presentation | Ergonomics Presentation | From Batch to Flow Game | ILM Lean Blog | Introduction to Process Capability | Standardized Work Presentation
Choosing Lean | Kaizen Presentation | 5 Why Presentation | 5S Game | 5S Presentation | 5S Audit Sheet | Lean Overview Presentation | SPC Presentation | 5S | 5S Audit | 5S Housekeeping | 5S Principles | 5S Program | 5S Training | Andon | Autonomation | Autonomous Maintenance
Continuous Improvement | Heijunka | Jidoka | JIT | Kaizen | Kanban | Lean Behaviors | Lean Implementation | Lean Links | Lean Assessment | Lean Blog | Lean Definitions | Lean Principles | Lean Thinking | Lean Training | Lean Tools | Lean Store | What is Lean Manu.
Poka Yoke | Seven Wastes | Site Search | SMED | TPM | Value Stream Mapping | TPM Training | TPM Implementation | TPS | TPS Training | Implementation Rules | Visual Factory | Contact | Lean Overview | SPC Presentation | Lean Manufacturing Assessment
5S Presentation | 5S Game | 5S Audit Sheet | 7 Wastes Presentation | 7 Wastes Check-sheet | 5 Whys Presentation | VSM Presentation | TPM Presentation | SMED Game | Poka Yoke Game | Kanban Presentation | Kaizen Presentation | 1 Piece Flow Game | Choosing Lean Presentation
Copyright 2008-2010 © ELSE Inc. Implement-Lean-Manufacturing.com All rights reserved