www.implement-lean-manufacturing.com
Home About Lean Lean Road Map Lean Foundations Core Concepts Advanced Concepts Lean Store Site Map
NAVIGATION LEGEND
Silver - ELSEinc.com
Orange -main areas
Aqua - info pages.
Lean Store
ILM Lean Blog
Lean Road Map
About Lean
Starting the Lean Trans.
Choosing Lean Pres.
Lean Overview Pres.
Lean Manu. Assessment
Lean Ball Game
Lean Foundations
5S
5S Presentation
5S Game
5S Principles
5S Housekeeping
5S Program
5S Training
5S Audit
5S Audit Check-sheet
Seven Wastes
7 Wastes Presentation
7 Wastes Check-sheet
1 Piece Flow
Batch to Flow
5 Why
Visual Factory
Cell Layout and Flow
Ergonomics
Standardized Work
Lean Core Concepts
VSM Presentation
Kaizen Presentation
Poka Yoke Simulation
TPM Presentation
Lean Advanced Concepts
Kanban Presentation
SMED Simulation
Process Capability Pres
SPC Presentation
Lean Links
Search
 
News and Updates
Interested in being kept up to date with information from Implement Lean Manufacturing website or on ELSE Inc. new or revised products send us an email here.
 
Microsoft Store

Microsoft Store

 

What steps do I need to take

to implement it successfully

trainingThe implementation of a 5S Program is a simple process. Yet, so many companies fail. It's a shame. If they would only set up a 5S Implementation plan and stick to it...

Here are the ground rules:


Prerequisites:

- Lean Manufacturing Overview Training - since a 5S program or system is the foundation upon which lean manufacturing evolved.

- Seven Wastes Training


Without that, your people will feel lost at sea (especially without understanding the Seven Wastes)

Understand the Seven Wastes yourself. Go to the plant floor and see for yourself (Genchi Genbutsu is the Japanese term for this fundamental lean concept). Open your eyes and see the wasted opportunities everywhere.


Implementation Steps

1. Get trained in the 5S program.

Please follow the link to the 5S Workshop material section for more details.

2. Communicate to the Operating Committee the results of your training.

3. Decide on a pilot area together with the Operating Committee.

Two and three go together.

This would be a short discussion to give them an overview of the 5S program and to decide on the pilot area. You could get some suggestions as to what people you could bring in the team.

My suggestion: Pick a trouble area. After all, you want to make an impression, so that people would see immediately the great improvements.

4. Put together a small 5S core implementation team. Choose your team members carefully from several departments (I.e. Production, Maintenance, Materials, Engineering, etc.).

They should be people who work in that specific area or are part of the support departments and know that work cell.

5. Train them in 5S. You can do that yourself. Do you need 5S training material?

6. Establish a 5S Program Implementation Plan for the pilot project with your team.

Decide on:

You get the picture.......

7. Present the plan to the Operating Committee / Management Team.

8. Refine plan to implement 5S on the pilot area (a specific work cell, product line, etc.).

9. Execute the plan.

10. Present the results to the operating committee, together with the team. Show the condition before and after.

11. Let it run for a while, in this new state.

12. Get feedback from the people who work in the area and from the support groups.

13. Make adjustments according to their observations, if they make sense.

14. When ready for the next step, use the knowledge accumulated by everybody and make the 5S implementation plan for the whole facility. Use the teamwork approach.

You cannot do much by yourself (I'm not trying to put you down, you are doing great).Lean is about people working together to succeed for their future.




Return from "5S Program Implementation" to "5S" Page



Return to Home Page

 

 

Welcome to the Implement Lean Manufacturing website, a division of ELSE Inc. We have added a page on Statistical Process Control.

The ELSE Inc. website is the direct result of our efforts to grow to better serve you our customer and friend.

Improving the value we provide to you is our greatest focus, thank you for your support.




Customized and Customizable Presentation

If you would like to have a presentation or simulation that is customized for your organization or Customizable PowerPoint Presentation please contact sales@elseinc.com.




Thank You to Our Customers

customers

customers

customers

customers

customers

Important Links

The Lean Store

Tony McNaughton's  Lean Thinking Pty Ltd.

 

       
Home | Lean Store | Lean Road Map | Lean Foundations | Lean Core Concepts | Lean Advanced Concepts | VSM Presentation | TPM Presentation | SMED Game | 7 Wastes Simulation | 7 Wastes Checksheet | Poka Yoke Game | 1 Piece Flow Game | Kanban Presentation
ELSE Inc. Site | Starting the Lean Transformation | Cell Layout and Flow Concepts Presentation | Ergonomics Presentation | From Batch to Flow Game | ILM Lean Blog | Introduction to Process Capability | Standardized Work Presentation
Choosing Lean | Kaizen Presentation | 5 Why Presentation | 5S Game | 5S Presentation | 5S Audit Sheet | Lean Overview Presentation | SPC Presentation | 5S | 5S Audit | 5S Housekeeping | 5S Principles | 5S Program | 5S Training | Andon | Autonomation | Autonomous Maintenance
Continuous Improvement | Heijunka | Jidoka | JIT | Kaizen | Kanban | Lean Behaviors | Lean Implementation | Lean Links | Lean Assessment | Lean Blog | Lean Definitions | Lean Principles | Lean Thinking | Lean Training | Lean Tools | Lean Store | What is Lean Manu.
Poka Yoke | Seven Wastes | Site Search | SMED | TPM | Value Stream Mapping | TPM Training | TPM Implementation | TPS | TPS Training | Implementation Rules | Visual Factory | Contact | Lean Overview | SPC Presentation | Lean Manufacturing Assessment
5S Presentation | 5S Game | 5S Audit Sheet | 7 Wastes Presentation | 7 Wastes Check-sheet | 5 Whys Presentation | VSM Presentation | TPM Presentation | SMED Game | Poka Yoke Game | Kanban Presentation | Kaizen Presentation | 1 Piece Flow Game | Choosing Lean Presentation
Copyright 2008-2010 © ELSE Inc. Implement-Lean-Manufacturing.com All rights reserved