www.implement-lean-manufacturing.com
Home About Lean Lean Road Map Lean Foundations Core Concepts Advanced Concepts Lean Store Site Map
NAVIGATION LEGEND
Silver - ELSEinc.com
Orange -main areas
Aqua - info pages.
Lean Store
ILM Lean Blog
Lean Road Map
About Lean
Starting the Lean Trans.
Choosing Lean Pres.
Lean Overview Pres.
Lean Manu. Assessment
Lean Ball Game
Lean Foundations
5S
5S Presentation
5S Game
5S Principles
5S Housekeeping
5S Program
5S Training
5S Audit
5S Audit Check-sheet
Seven Wastes
7 Wastes Presentation
7 Wastes Check-sheet
1 Piece Flow
Batch to Flow
5 Why
Visual Factory
Cell Layout and Flow
Ergonomics
Standardized Work
Lean Core Concepts
VSM Presentation
Kaizen Presentation
Poka Yoke Simulation
TPM Presentation
Lean Advanced Concepts
Kanban Presentation
SMED Simulation
Process Capability Pres
SPC Presentation
Lean Links
Search
 
News and Updates
Interested in being kept up to date with information from Implement Lean Manufacturing website or on ELSE Inc. new or revised products send us an email here.
 
Microsoft Store

Microsoft Store

 
training services

When performing a 5S audit please use a 5S audit check sheet.


Use one check sheet for each area you audit. I hope you remembered to partition your plant and office in 5S areas.


That will be very helpful as you "attack" every opportunity for improvement or non-conformance in each area.


Some helpful hints to get you started:

  1. Start your audit by checking items listed on the previous audit – to see if they have been completed (and can be crossed off or not).


This means the best way to improve your score on future audits is to take the current audit and address each item listed.

  1. Do your audit on a regular basis, to ensure that the work everyone has done in implementing the 5S program in the area is maintained over time.
  2. Just walk through the area being audited, looking for the items outlined on the audit checklist.

    Examples of what is considered unacceptable:
  • Items in the area that are not needed, no longer used, or do not belong in that area (eg. Items from another line, left-over parts from previous builds, etc).
  • Items that ARE needed in the area but that are not in their designated/labelled spot (have been moved/used and not put away)
  • Items that are needed but do not have a labelled spot (so cannot determine if they are out of place or not) – it includes tools, supplies, WIP, Finished Goods, Suspect parts, etc.
  • Work areas and aisles not clearly indicated – so can’t tell where things can be stored and what areas need to be kept clear.
  • Height/Quantity Limits NOT set/adhered to – meaning proper amounts of items (raw, WIP, finished goods, etc) present, as previously agreed to and labelled (by area size or Qty labels).
  • Dirt, Oil, Grease, Coolant found on Floors, Walls, Stairs, Work Surfaces, Equipment.


NOTE: Points are NOT deducted if still working in the area and the dirt/oil/grease/coolant is considered part of the process (that will be cleaned up at end of the day).


However, if no longer working in the area, or if an immediate Health & Safety Hazard, the mess needs to be cleaned up before audit is over or points will be deducted.

  1. Measures NOT put in place to prevent area from getting dirty.


This relates to the above dirt/oil/grease/coolant issues, as to whether or not attempts have been made to reduce these and contain them.


The idea is to minimize the amount of hourly or daily cleaning needed by using catch pans (under testers or known leaking machines), by fixing leaks, by mopping floors several times per day, by using shields to deflect material from processing into containers, etc.

  1. Cleaning materials used in the area (Shovels, brooms, mops, dustpans, garbage & cardboard containers, etc) need to be labelled to show where they belong and be easily accessible where needed.
  2. Labels & Lines need to remain readable/intact – meaning as they wear they need to be fixed or replaced so they remain usable by everyone.
  3. Plant rules not being followed (mostly relates to Safety infractions seen during 5-S audits such as WHMIS label issues, blocked exits/fire equipment, unsafe equipment, etc). These will be listed on 5-S audit and points deducted.



The supervisor follows up on previous audits noted problems – score is based on whether actions were taken or not to correct previous problems (reflected by number of repeat items found).

Forms needed for the 5S Audit:

  • 5S audit check sheet
  • Open issues: list with responsibilities and deadlines


A word of advice: you can write each non-conformity on a suggestion form and pass them on to the department managers.


They can assign people to do the work and also, it would count as them coming up with suggestions for improvement.


It is a great idea to create your own lean suggestion program and recognize and reward your people for their extra effort.




Return from "5S Audit" to "5S" Page



Return to Home Page

Welcome to the Implement Lean Manufacturing website, a division of ELSE Inc. We have added a page on Statistical Process Control.

The ELSE Inc. website is the direct result of our efforts to grow to better serve you our customer and friend.

Improving the value we provide to you is our greatest focus, thank you for your support.




Customized and Customizable Presentation

If you would like to have a presentation or simulation that is customized for your organization or Customizable PowerPoint Presentation please contact sales@elseinc.com.




Thank You to Our Customers

customers

customers

customers

customers

customers

Important Links

The Lean Store

Tony McNaughton's  Lean Thinking Pty Ltd.

 

       
Home | Lean Store | Lean Road Map | Lean Foundations | Lean Core Concepts | Lean Advanced Concepts | VSM Presentation | TPM Presentation | SMED Game | 7 Wastes Simulation | 7 Wastes Checksheet | Poka Yoke Game | 1 Piece Flow Game | Kanban Presentation
ELSE Inc. Site | Starting the Lean Transformation | Cell Layout and Flow Concepts Presentation | Ergonomics Presentation | From Batch to Flow Game | ILM Lean Blog | Introduction to Process Capability | Standardized Work Presentation
Choosing Lean | Kaizen Presentation | 5 Why Presentation | 5S Game | 5S Presentation | 5S Audit Sheet | Lean Overview Presentation | SPC Presentation | 5S | 5S Audit | 5S Housekeeping | 5S Principles | 5S Program | 5S Training | Andon | Autonomation | Autonomous Maintenance
Continuous Improvement | Heijunka | Jidoka | JIT | Kaizen | Kanban | Lean Behaviors | Lean Implementation | Lean Links | Lean Assessment | Lean Blog | Lean Definitions | Lean Principles | Lean Thinking | Lean Training | Lean Tools | Lean Store | What is Lean Manu.
Poka Yoke | Seven Wastes | Site Search | SMED | TPM | Value Stream Mapping | TPM Training | TPM Implementation | TPS | TPS Training | Implementation Rules | Visual Factory | Contact | Lean Overview | SPC Presentation | Lean Manufacturing Assessment
5S Presentation | 5S Game | 5S Audit Sheet | 7 Wastes Presentation | 7 Wastes Check-sheet | 5 Whys Presentation | VSM Presentation | TPM Presentation | SMED Game | Poka Yoke Game | Kanban Presentation | Kaizen Presentation | 1 Piece Flow Game | Choosing Lean Presentation
Copyright 2008-2010 © ELSE Inc. Implement-Lean-Manufacturing.com All rights reserved